Ground reinforcement piles - List of Manufacturers, Suppliers, Companies and Products | IPROS

Ground reinforcement piles Product List

1~3 item / All 3 items

Displayed results

Pure Pile Method | High-strength Ground Reinforcement Piles with Zero Soil Influence

Constructing piles with 100% cement milk without mixing local soil. A pure pile method that completely prevents differential settlement regardless of soil quality.

To ensure the long-term structural safety of buildings, it is essential to accurately analyze ground characteristics and implement reinforcement work to prevent uneven settlement. GeoTech's Pure Pile method is an innovative technology that expands the ground laterally with a conical excavation head and directly replaces it with high-strength cement milk to form pile-like reinforcement bodies. The 100% cement milk structure, which eliminates mixing with local soil, allows for stable high strength and quality without being affected by soil conditions, even in diverse ground that includes humus layers. By evenly distributing a large number of reinforcement bodies with a designed pile diameter of 20 cm, we ensure high vertical load-bearing capacity and effectively eliminate the risk of settlement accidents by balancing and supporting the building load across a surface. Additionally, the construction structure generates very little residual soil, allowing for reductions in residual soil removal and disposal costs. At GeoTech, under an ISO-certified quality management system, our specialized construction technicians thoroughly manage real-time data to provide reliable and trustworthy foundation reinforcement.

  • others
  • Ground reinforcement piles

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement | RES-P method | No cement used | Low noise | No soil displacement | Piles

Thorough consideration for neighbors without using cement! The low-noise, no-dirt RES-P method clears construction in densely populated areas.

To avoid serious risks such as differential settlement due to the building's own weight, structural tilting, and exterior wall cracks, appropriate ground reinforcement is essential. GeoTech Corporation's RES-P method involves driving slender steel pipes into soft ground, enhancing bearing capacity through the combined action of the ground and the pipes. The main feature is that it does not use cement solidifiers, resulting in zero dust, mud stains, and construction debris, keeping the site clean. Vibration and noise are also extremely low, minimizing the impact on surrounding areas, even in densely populated residential areas or narrow urban sites, allowing for smooth construction. A small machine based on a 2-ton truck maintains the leveling condition and facilitates a smooth handover to subsequent processes. We provide reliable and clean reinforcement work through the digitization of construction data and strict quality control.

  • others
  • Ground reinforcement piles

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

DM method | Environmentally friendly ground reinforcement piles utilizing recycled materials and no soil displacement

Reuse of steel scrap and non-use of cement for non-dumping penetration. A sustainable foundation construction method that balances environmental impact reduction and high load-bearing capacity.

GeoTech Co., Ltd.'s "DM Method (Double Metal Method)" is an environmentally friendly small-diameter steel pipe pile that thoroughly emphasizes iron scrap recycling and the absence of cement. As a measure against differential settlement of buildings, it employs large ductile cast iron tips with recycled material (FOD450A), contributing to a decarbonized society. By not using cement milk, it eliminates the risk of hexavalent chromium leaching and achieves zero construction waste through soil-less construction. The structure, which bolts large wings up to 3.5 times the diameter of the steel pipe, demonstrates high tip support strength and has obtained performance certification (No. 10-01) from the General Incorporated Foundation Japan Building Research Institute (GBRC). Strict inspections at its own factory, real-time management of construction data, and a nationwide network of association members ensure the highest standards of technical reliability and quality.

  • others
  • Ground reinforcement piles

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration